Art Block classroom renovation and Maori Studies Block Enhancements

Classroom Renovation Project Transforms Learning Spaces at Avondale College

Max Style Ltd recently completed an extensive classroom renovation project at Avondale College, successfully transforming multiple educational spaces across the campus. As the Main Contractor for the first phase of Avondale College's Art Block renovations, our team delivered significant improvements that enhance both functionality and aesthetics of key learning environments.

We renovated several parts of the school as part of our classroom improvement project. Our work included:

Art Room Classroom Renovation

The centrepiece of our classroom renovation efforts focused on modernising the Art Room facilities. This specialised classroom renovation included:

  • Removal and strategic reinstallation of cabinetry to accommodate new wall treatments
  • Installation of durable Duralam wall linings designed for high-traffic classroom environments
  • Addition of Autex pinboard linings to enhance the classroom’s functionality for art displays
  • Complete replacement of carpet and vinyl flooring to update the classroom aesthetic
  • Fresh paint throughout the entire classroom space, creating a bright, inspiring learning environment

Additional College Improvements

As part of our complete school improvement work, Max Style Ltd successfully completed these projects:

  • Enhanced Accessibility: Installation of a new door and landing for the Maori Studies Department, ensuring all classroom spaces are accessible to all students
  • Temporary Medical Suite: Professional delivery and installation of two relocatable buildings creating a functional temporary medical consulting space
  • Water Damage Remediation: Thorough repairs addressing water damage in the administration block
  • Maori Studies Block Enhancement: Installation of custom Autex wall linings featuring the school’s colors, creating a culturally significant learning space

Minimising Educational Disruption

Understanding the critical importance of classroom availability in educational settings, Max Style Ltd prioritized efficiency in our classroom renovation timeline. All renovations were successfully completed during the summer holiday period, ensuring zero disruption to regular classroom activities and learning experiences.

How can we help?